Job Description

Topsides anticorrosion treatment and repaint under climate-controlled cover

Main deck inner bulwark local anticorrosion treatment and repaint

Main deck inner walls cleaning and local repaint

Anchor pockets and hull protection modification

Main engine exhaust outlets modification

Underwater repaint with local sandblasting and raising 30 cm the waterline

Location: La Rochelle

Specification

Type
Motor Yacht

Length
32m

Beam

Draft

Builder

WISTING

Year of build
2009

Refit Location

La Rochelle


  • Location: La Rochelle
  • Project Management team on site
  • In-water maintenance
  • 250 meters of afloat repair dock
  • 5000 m² hard standing platform
  • 300 ton elevator
  • 35 ton wreck crane, 250 meters length afloat repair docks

Discover more

Project Portfolio

View more case studies of IMM clients